Quick Reference

Menu map, demo-data codes and statuses


Group Models
Returns & Lodgement Production Sales Return, Reporting Period, Return Tenement, Lodgement, Lodgement Error, Return Amendment
Operations & Tenements Mining Operation, Operator History, Tenement, Operation Tenement, Stockpile
Production & Processing Raw Material Mined (+Commodity), Raw Material Transfer (+Commodity), Processing Activity, Product Processed (+Commodity), Processed Product Transfer, Stockpile Transaction, Stockpile Balance
Sales & Freight Sale, Sale Commodity, Freight Cost
Control & Assurance Reconciliation, Validation Rule, Validation Result, Return Review, Return Declaration, Source Record, Reported Value Source
Reference Data Organisation, Person, Commodity, Raw Material Type, Product Type, Unit of Measure

Key Codes in the Demo Data

Code What it is
BOON / GSQ-71204 Boonderoo Coal Mine — open cut, coal quarterly (holder BCPL, operator TMS)
CARD / GSQ-58817 Mount Cardwell Gold Mine — open cut, mineral annual
RTN-BOON-2026Q1 Coal Q1 return — ACCEPTED (after a failed first template upload)
RTN-BOON-2026Q1-A1 Its amendment — NSC weight reconciliation cuts export sale by 1,240 t
RTN-BOON-2026Q2 Coal Q2 return — VALIDATION_FAILED, due 21 July: stockpile variance −6.2% unexplained, no declaration
RTN-CARD-FY2026 Mineral annual FY2025-26 — DATA_COLLECTION: 412 kt ore, 1.85 Mt waste, 892 kg doré
EXP-2026-0142 Export coking sale to Japan (185 kt, Gladstone) — later adjusted by -CR1
GSQ-2026-118845 GSQ confirmation number for the accepted Q1 lodgement
GSQ-U-004 Lodgement error — "kt" not permitted on the SALES sheet (whole tonnes)
ML 70441/70442 / ML 20015 Boonderoo and Cardwell mining leases

Status Vocabularies (the important ones)

Return workflow: DRAFT → DATA_COLLECTION → (VALIDATION_FAILED) → READY_FOR_REVIEW → UNDER_REVIEW → APPROVED → READY_FOR_LODGEMENT → LODGED → ACCEPTED / REJECTED, with AMENDMENT_REQUIRED → AMENDED, WITHDRAWN, CLOSED

Value status: RAW → ESTIMATED / PROVISIONAL → MEASURED → CALCULATED → VERIFIED → APPROVED → SUPERSEDED

Lodgement result: PENDING → SUCCESSFUL / FAILED_VALIDATION → ACCEPTED / REJECTED

Validation severity: INFORMATION · WARNING · ERROR · BLOCKING — unresolved BLOCKING failures hold the return before lodgement

Tenement production status: mineral PRODUCING · NOT_PRODUCING · OPERATING_NOT_PRODUCING · OTHER_PURPOSE_LEASE; coal PRODUCING · NOT_PRODUCING

Rules of Thumb

  • One return per operation per period (+1 per amendment); every mining lease associated with the operation must appear as a Return Tenement with a production status.
  • Coal quarterly rows carry reporting_month (first of the month) — three months per quarter; mineral annual rows leave it blank.
  • Open-cut mineral returns must report waste rock/overburden with a unit; underground may report zero.
  • A stockpile variance beyond tolerance needs a comment, or validation fails the return.
  • Adjusting sales are negative-quantity rows referencing the original sale — never edit a lodged sale.
  • Quantities in tonnes lodge as whole tonnes; "kt" is display-only (see lodgement error GSQ-U-004 in the demo data).
  • A snapshotted declaration (DECLARED) must exist before READY_FOR_LODGEMENT.